Prev
Next
E.2. Complete Cluster Shutdown
In this scenario one shuts down all cluster nodes and resources and upgrades all the nodes before restarting the cluster.
E.2.1. Procedure
On each node:
Shutdown the cluster stack (Heartbeat or Corosync)
Upgrade the Pacemaker software. This may also include upgrading the cluster stack and/or the underlying operating system..
Check the configuration manually or with the
crm_verify
tool if available.
On each node:
Start the cluster stack. This can be either Corosync or Heartbeat and does not need to be the same as the previous cluster stack.
Prev
Appendix E. Upgrading Cluster Software
Up
Home
Next
E.3. Rolling (node by node)